Recordsnpmjose4.15.9
Environment detail
Project-level observations and symbol/contract verifications are counted separately and never combined.
These counts do not distinguish how the symbol was called: overloads, argument shapes and options are pooled together. What a particular call shape does is proven by a sample's contract, not by these numbers.
| Environment | Confidence | Observations | Verified | Pass rate | Peers | Last seen |
|---|---|---|---|---|---|---|
| node 24.13 · TS · npm · windows
Observations: PROJECT_PROCESS 0✓ 1✕ · PROJECT_TEST 0✓ 1✕ — Usage: USED 2✓
|
LOW | 2 +2 | 0 | 0% | 1 | 2026-11-03 |
Recent failure clusters
-
observed PROJECT_PROCESS ERR_ASSERTION Evidence gap ×8 4.15.9 → 6.2.4 → 6.2.5 → 6.2.8 → 6.2.9 executionContext=nodeEvidence quality: legacy-evidence-incomplete · Environment variants: 3 · First recorded: 2026-08-14 · Last seen: 2026-11-17Diagnostic re-verification candidate
-
observed PROJECT_TEST Evidence gap ×3 4.15.9 → 6.2.5 → 6.2.8 executionContext=node · os=windows · runtime=node@24.13Evidence quality: legacy-evidence-incomplete · Environment variants: 2 · First recorded: 2026-08-21 · Last seen: 2026-11-03Diagnostic re-verification candidate
Symbols
No symbols with evidence yet.