Recordsnpm@rollup/rollup-win32-x64-gnu4.62.5
Environment detail
Project-level observations and symbol/contract verifications are counted separately and never combined.
These counts do not distinguish how the symbol was called: overloads, argument shapes and options are pooled together. What a particular call shape does is proven by a sample's contract, not by these numbers.
| Environment | Confidence | Observations | Verified | Pass rate | Peers | Last seen |
|---|---|---|---|---|---|---|
| node 22.23 · JS · npm · linux glibc
Observations: PROJECT_PROCESS 3✓ — Usage: USED 1✓
|
MEDIUM | 3 +1 | 0 | 100% | 2 | 2026-08-21 |
| node 22.23 · JS · npm · linux glibc
Observations: PROJECT_PROCESS 5✓ 5✕
|
ELEVATED FAILURE | 10 | 0 | 50% | 1 | 2026-08-30 |
Recent failure clusters
-
observed PROJECT_PROCESS ERR_ASSERTION Evidence gap ×5 4.62.5 executionContext=node · moduleSystem=esm · os=linux · runtime=node@22.23Evidence quality: legacy-evidence-incomplete · Environment variants: 1 · First recorded: 2026-08-27 · Last seen: 2026-08-30Diagnostic re-verification candidate
Symbols
No symbols with evidence yet.