Recordspypipackaging24.1
Which symbol ran where
Symbols × operating systems for this version. Cells drill into the package's compatibility cube.
| alpine musl | 11 | |
|---|---|---|
| packaging.specifiers.InvalidSpecifier | ||
| packaging.specifiers.SpecifierSet | 100%1 | |
| packaging.specifiers.SpecifierSet.contains | ||
| packaging.version.Version | 100%1 |
Reading a cell: The number is how many recorded observations the rate divides — one build files an observation per stage it reached, so it counts neither builds nor machines nor people. The document beside it is a different fact from a different source: whether a sample exists at that coordinate, and how our own run of it went there.
- no sample at this coordinate yet
- there is a sample here, and nothing of ours has run it at this coordinate yet
- there is a sample here, and our run of it at this coordinate came back clean
- there is a sample here, and our run of it at this coordinate failed
- there is a sample here, and this coordinate records both a passing and a failing run of it
- nothing recorded — unknown, never "works" and never "broken"
- there is a level below this cell — click to open it
A document means there is a sample at that coordinate. Whether one EXISTS is a fact about this release and this API and does not change with OS, runtime or package manager; its COLOUR is how that sample ran in the environment you are looking at.
Environment detail
Project-level observations and symbol/contract verifications are counted separately and never combined.
These counts do not distinguish how the symbol was called: overloads, argument shapes and options are pooled together. What a particular call shape does is proven by a sample's contract, not by these numbers.
| Environment | Confidence | Observations | Verified | Pass rate | Peers | Last seen |
|---|---|---|---|---|---|---|
| python 3.10 · Python · pip · windows
Observations: PROJECT_PROCESS 1✓
|
LOW | 1 | 0 | 100% | 1 | 2026-08-17 |
| python 3.12 · Python · pip · linux musl · docker
Observations: PROJECT_LOAD 2✓ · PROJECT_TEST 2✓ — Usage: USED 2✓ — Verified: CONTRACT 3✓
|
MEDIUM | 4 +2 | 3 | 100% | 1 · 2✓ | 2026-08-30 |
Symbols
- packaging.specifiers.InvalidSpecifier 1 1 of 1 runs passed
- packaging.specifiers.SpecifierSet 1 1 of 1 runs passed
- packaging.version.Version 2 3 of 3 runs passed
- packaging.specifiers.SpecifierSet.contains 1 2 of 2 runs passed