codesamplex

greenlet@3.2.4

Compatibility matrix

Project-level observations and symbol/contract verifications are counted separately and never combined.

These counts do not distinguish how the symbol was called: overloads, argument shapes and options are pooled together. What a particular call shape does is proven by a sample's contract, not by these numbers.

Environment Confidence Observations Verified Pass rate Peers Last seen
python 3.10 · Python · pip · windows
Observations: PROJECT_PROCESS 0✓ 1✕
LOW 1 0 0% 1 2026-08-14

Symbols

No symbols with evidence yet.