CodeSampleX

Recordsgolanggoogle.golang.org/apiv0.273.1

Which symbol ran where

Symbols × operating systems for this version. Cells drill into the package's compatibility cube.

1 2 1○ 42026-10-14
debian glibcubuntu glibc
google.golang.org/api/discovery/v1.NewService 100%1
google.golang.org/api/googleapi.CheckResponse 100%2 100%6
google.golang.org/api/googleapi.CloseBody 100%1
google.golang.org/api/googleapi.CombineFields 100%1
google.golang.org/api/googleapi.Error 67%3 100%6
google.golang.org/api/googleapi.Expand 100%1

Showing the environments with the most evidence.

Reading a cell: The number is how many recorded observations the rate divides — one build files an observation per stage it reached, so it counts neither builds nor machines nor people. The document beside it is a different fact from a different source: whether a sample exists at that coordinate, and how our own run of it went there.

A document means there is a sample at that coordinate. Whether one EXISTS is a fact about this release and this API and does not change with OS, runtime or package manager; its COLOUR is how that sample ran in the environment you are looking at.

Environment detail

Project-level observations and symbol/contract verifications are counted separately and never combined.

These counts do not distinguish how the symbol was called: overloads, argument shapes and options are pooled together. What a particular call shape does is proven by a sample's contract, not by these numbers.

Environment Confidence Observations Verified Pass rate Peers Last seen
go 1.26 · Go · go · linux glibc · docker
Observations: PROJECT_COMPILE 0✓ 1✕ · PROJECT_LOAD 4✓ · PROJECT_TEST 4✓ 2✕ — Usage: USED 4✓ — Verified: CONTRACT 5✓ 3✕
ELEVATED FAILURE 11 +4 8 64% 1 · 1✓ 2026-10-14
go 1.26 · Go · go · linux glibc
Observations: PROJECT_COMPILE 2✓ · PROJECT_PROCESS 16✓ — Usage: USED 46✓ — Verified: UNKNOWN 0✓ 6✕
ELEVATED FAILURE 18 +46 6 75% 1 2026-10-14
go 1.26 · Go · go · linux glibc · docker
Observations: PROJECT_LOAD 2✓ · PROJECT_TEST 2✓ — Usage: USED 2✓ — Verified: CONTRACT 1✓
LOW 4 +2 1 100% 1 · 1✓ 2026-10-14

Recent failure clusters

Symbols

Published samples